The timeline for a home addition in Los Altos depends on the size of the addition, design complexity, and the local permitting process. In most cases, homeowners should expect a total timeline of 6 to 12 months from initial planning through construction completion.
W & W Builders Group helps guide clients through each phase with a structured, design-build approach to keep timelines realistic and projects organized.
Typical timeline breakdown:
Planning & Design: 1–2 months
Initial consultations, layout planning, architectural drawings, and engineering coordination.Permits & City Approvals: 2–4 months
Los Altos has specific zoning, setback, and FAR requirements. Permit review timelines vary based on project scope and city feedback.Construction: 3–6 months
Construction duration depends on the type of addition—such as a room expansion, primary suite addition, or second-story addition—and the level of structural work involved.
Projects that include structural modifications, system upgrades, or coordination with broader remodeling work may require additional time. Smaller room additions can often move faster once permits are approved.
By working with W & W Builders Group, Los Altos homeowners benefit from a team experienced in local permitting, inspections, and construction sequencing—helping minimize delays and deliver a well-executed home addition from start to finish.